Trollhatten Day 2 creating a river
We headed off to see the dam sluice gates open with a slight delay as P swore at his bike and tried to fix a twisted wheel.
We got a great spot on the bridge and at 3 pm they let the first gate open followed by the other 3 with them arriving into the bottom of the gorge at the same time and then the mass of water heading under the bridge and into the river.
It lasts 8 minutes and they do it just for tourists and it was well worth staying for it was great.
I will add a video but if you can't open it there is a stream of photos as well.
link to video in album
We then a did a guided tour of the intake and turbine houses .
We then biked to the canal locks and were lucky to arrive when a large boat was about to go through.
| it started really low in the lock |
| then it rose up till it was above us, the lock is so manarrow I could touch the boat the captain never touched the side quite impressive. |
It went up the lock and the them we chased it through town stopping to watch as each bridge was raised/ opened . Culminating at the rail bridge which the middle section was raised 27 ft.
| a happy P after a day of engineering |
Comments
Post a Comment
You are welcome to comment, then I'll know I'm not just writing my diary